The Taking of Pelham One Two Three

Factual error: The signalling board in the control tower animates Pelham 123's movements in such detail that the police can tell when it is moving and when it has stopped. Indeed the police deduce that the hijackers have abandoned the train from this. In reality this could not happen. Subway tracks are divided into variable length blocks typically hundreds of yards in length. The signalling boards are only able to show which block a train is in. The only way to tell if a train is moving is when it moves from one block to the next and the only way to estimate speed is by how quickly it occupies successive blocks. A slow-moving or stationary train are thus not able to be so easily distinguished from one another on the board.

Revealing mistake: When Mr. Green pulls out of 28th Street, we see him disengage the "Dead Man's Feature" (by pressing down on the throttle with his hand). However, he does not actually move the control lever to make the train move. In that position, the train is at "idle" and will not accelerate.

moviefan2345

More mistakes in The Taking of Pelham One Two Three

Lt. Rico Patrone: Even great men have to pee.

More quotes from The Taking of Pelham One Two Three

Trivia: New York Transit Authority has code words for trains going through subways, based on the departure station and time of departure. Pelham One Two Three means the train left Pelham Bay Park Station at 1:23 pm. Ever since the 1974 film was released, New York Transit authority has made a conscious decision to try very hard not to let subway trains leave Pelham Bay Park Station at 1:23 in the morning or afternoon.

Rob Halliday

More trivia for The Taking of Pelham One Two Three

Join the mailing list

Separate from membership, this is to get updates about mistakes in recent releases. Addresses are not passed on to any third party, and are used solely for direct communication from this site. You can unsubscribe at any time.

Check out the mistake & trivia books, on Kindle and in paperback.